Westergate WSW UV MCC, Portsmouth Water

Scope of works 

We designed and built a new MCC Control Centre including the following,

  • 2 No. mains generator ACBs with automatic change over.
  • 100A active harmonic filter.
  • 2 No. 132kw borehole pump VSD starter sections.
  • 1 No. 110kw borehole pump VSD starter sections.
  • 8 No. feeders of various ratings control circuits.
  • 1 No. ICA section containing UPS, dual/transformers, PLC and associated hardwired control logic.
  • The automation of the panel was via Schneider M340PLC and magelis HMI. The software was written and tested in house.

Client
 Portsmouth Water 
Contract
 Westergate WSW UV MCC

                 

Please contact Stuart Rice on +44 (0) 2380 665544 or stuart.r.rice@trant.co.uk